Sewages
Client
The Construction Authority for Portable Water and Waste Water Project
Duration
2024
Contract Value
40.65 Million EGP
Type
Sewage
1- Electromechanically work
2- Completed all the civil work of lift pump station
3- Gravity sewage network of 200: 500 mm UPVC pipe
4- Square & circular manholes with a depth from 1.5m to 5.5m
5- 2450 L.M force main line of 350 ductile iron pipes and
6- Connection house pipes of 160 mm UPVC pipes with estimated
Length 12000 L.M.
7- 350 mm ductile iron pipe to be passed under 2 cross canal.
Client
The Construction Authority for Portable Water and Waste Water Project
Duration
2025
Contract Value
32.485 Million EGP
Type
Sewage
The construction of 2 lift pump station :-
- First one for Abd Al Hamed Atya consist of 2 submersible Pump with capacity 53 L/ sec
- Second one for Abo Al Hassan consist of 3 submersible
- pump with capacity 47 L/ sec
- Supply and fixe all electromechanical work for lift pump station.
- Construct all auxiliary buildings for two lift pump station such Security building, Generator shed, store Building ….. Extra.
- Sewer network of 200 mm to 400 mm UPVC pipes for about 5100 m length included circular and square M.H.
- 2 line force main with 3500 m of 350 mm / 200 mm UPVC Pipe includes valve chambers and slow down chamber.
• Pipe crossing under water canal with 350 mm UPVC pipe force main.
- Pipe crossing under ( rail way + canal + high way ) with 800 mm reinforced concrete pipe for 60 m length using microtunnel machine.
Client
The Construction Authority for Portable Water and Waste Water Project
Duration
2024
Contract Value
33 Million EGP
Type
Sewage
1- Grovty pipe line of 600 mm vitrified clay pipes with elastic joint
Estimated length ≈ 70 L.M
2- Precast concrete pipes for gravity lines of variables diameter 700
800 / 900 / 1000 / 1200 mm to construct 2295 L.M.
3- Construct 42 square manholes 1.2× 1.2 m / 1.75× 1.75m / 2× 2m
On gravity pipe lines with depth ranged from 2.5 to 405m
4- Installation backdrop pipe for manhole with drop more than 1.00m
5- Construct a pipe line tunnel under underground metro and railway using
Pipe Jack method to fixe 2200 mm precast concrete pipe to install 800mm
Cost iron pipe for a total length = 60m this includes 2 reinforced concrete
Shaft one for launching 10 × 10m / m deep and the other for delivered shaft
With 6 m diameter / 9 m deep.
6- 3000 L.M 160mm UPVC pipes for house connection includes check manholes
60 × 60 cm 60× 90cm
Why
Hinalco?
HINALCO stands out for its commitment to quality, innovation, and expertise in construction. With a proven track record across diverse sectors, we bring deep industry knowledge, advanced technology, and a dedication to client satisfaction to every project. Our approach emphasizes precision, safety, and sustainability, ensuring that each development meets the highest standards. Partnering with HINALCO means entrusting your project to a company that prioritizes excellence and delivers with unmatched reliability.